Team

Scott Crowdis, LEED AP, AScT.

Throughout Scott’s career he has proven himself to be a driven individual who has successfully led a wide range of roles in numerous construction and design projects. Starting out in the industry in metal fabrication and then moving into production and design offer many valuable insights into the entire building process. With over 20 years in the consulting industry, Scott has excellent time management, organizational and problem solving skills. He has a solid foundation of knowledge using AutoCAD, load modeling using both HAP and Trace and has led all aspects of production from schematic design to construction administration. Scott has been a team leader and is a very friendly and outgoing individual. He has extensive code knowledge and experience with a large variety of buildings including commercial, industrial, healthcare, educational and recreational facilities. Scott is a LEED Accredited Professional and is an Applied Science Technologist (AScT) through ASTTBC. He is proud to be the Production Lead at Emergent Mechanical.


EDUCATION/CERTIFICATIONS

  • Engineering Design and Drafting Diploma (1998) – S.A.I.T.
  • Project Management ENGD 432 (2005) – S.A.I.T.
  • LEED Accredited Professional (2007) 
  • Also completed ASHRAE fundamental design guides including fundamental design of hydronic heating systems, ventilation and psychometric analysis.
  • Applied Science Technologist status (AScT) through ASTTBC

 

EMPLOYMENT EXPERIENCE

  • Senior Mechanical Designer/Drafter

                  Falcon Engineering (2016-2019)

  • Mechanical HVAC Designer/Drafter 

                  Cima Plus, Kelowna, British Columbia (2015-2016)

  • Senior Mechanical HVAC Designer/Drafter

                  Reinbold Engineering, Kelowna, British Columbia (2013-2015)

  • Mechanical      HVAC Designer/Drafter 

                  Stantec Consulting Ltd. Kelowna, British Columbia (2010-2012)

  • Mechanical      Team Lead/Designer

                  Stantec Consulting Ltd. Calgary, Alberta (2008-2010)

  • Mechanical      HVAC Drafter/Production Staff

                  Stantec Consulting Ltd. Calgary, Alberta (1998-2008)


PROJECT WORK EXPERIENCE

  • Sunniva Cannabis Grow Facility, Kelowna BC, 2018
  • Summerland Secondary HVAC Upgrade, Summerland BC, 2018
  • Sunset Tower, Kelowna BC, 2017
  • Waste Water Treatment Upgrades, Tornoto ON, 2015
  • Providence Residential Towers, Calgary AB, 2013
  • University of British Columbia - Geo Exchange, Kelowna BC, 2011
  • UCVM Veterinary Medicine Support Building, Calgary AB. 2010
  • Hyatt Hotel, Calgary AB, 2007
  • Abbotsford Hospital, Vancouver BC, 2006
  • Telus Convention Center, Calgary AB, 2005

image13